The book of specifications and the defense reports are available below.
First book of specifications returned in January 2022. It includes the organizations and first ideas about the project Switched.
Second book of specifications returned in March 2022. It’s a better version of the first book of specifications.
First report returned in March 2022. It’s a summary of everything we’ve done since the first book of specifications.
First outline for the first presentation in March 2022.
Second report return in April 2022. It’s a summary of everything we’ve done since the first presentation.
Second outline for the second presentation in April 2022.
Last report returned in June 2022. It’s a presentation of the project and the advancement.
The outline for the third and last presentation in June 2022.
Installation and user manuals returned in June 2022. It presents the installation procedure and the game functionalities.